Specifications include, but are not limited to: In accordance with the plans and specifications, this work shall consist of replacing two corrugated metal pipes with a precast stiff leg bridge, roadway asphalt, dewatering, cast-in-place concrete; constructing curb, gutter, and sidewalk on both sides of the street, a valley gutter, pedestrian ramps; and installing pedestrian railings. The contractor shall provide access to the creek during dewatering so the City of Boise and the Idaho Department of Fish and Game can relocate Mussels in the Logger Creek; All trenches in pavement cut by the Contractor on roadways that are used for access in or around the project shall be backfilled and immediately covered with temporary or permanent pavement. These trenches must be backfilled and paved prior to opening the access to vehicular traffic, or as approved by the Resident Engineer.