Specifications include, but are not limited to: Provide all labor, materials, equipment, and administration to conduct a minimum of five (5) PUR102 inspections (more may be required, depending on construction methods used) and complete an Alaska Housing Finance Corporation (AHFC) Form PUR-102, Summary of Building Inspections for each inspection. At a minimum, inspections shall include: 1) Plan Approval (prior to construction start); 2) Footings and foundation; 3) Rough-in inspections; 4) Insulation and vapor barrier; 5) Final approval. Only an authorized inspector meeting AHFC’s criteria may perform the required inspections and complete the AHFC Form PUR-102. See attached “AHFC New Construction Inspection Guidelines” for more detailed information regarding the inspection guidelines/requirements. Firms are responsible to verify the Scope of Work assigned to this discipline.