Specifications include, but are not limited to: NH 24-3(69)76 The JCT S-279 West (MT-200) project is in Lewis and Clark County on MT 200 beginning at RP 75+0.751 (accumulated miles 76.486) and ending at RP 83+0.132 (accumulated miles 83.839), approximately 3.5 miles east of the unincorporated town of Lincoln. This project proposes a 0.15? centerline trench mill/fill, full width crack seal and seal and cover with new pavement markings, and bridge deck seal. Centerline rumble strips will be re-milled. NH 24-3(73)65 The Lincoln ? E&W project is in Lewis and Clark County on MT 200 beginning at RP 65+0.450 (accumulated miles 66.193) and ending at RP 75+0.751 (accumulated miles 76.486). This project proposes a 0.15? centerline trench mill/fill, full width crack seal and seal and cover with new pavement markings. Centerline rumble strips will be re-milled.