Specifications include, but are not limited to: 1. Mobilization and Demobilization 1.1. Perform work and operations necessary to: 1.1.1. Prepare and submit a written schedule 1.1.2. Move personnel, equipment, supplies, and incidentals to the project site. 1.1.3. Perform other work and operations and pay costs incurred, before beginning construction. 1.1.4. Complete similar demobilization activities. 1.1.5. Furnish all required submittals. 1.1.6. Comply with all Alaska Department of Labor and Workforce Development requirements. 2. Installation of Wastewater System 2.1. The Contractor shall supply labor, equipment, materials and supplies to perform the required work required to decommission and dispose of the existing septic system and install the new wastewater system. 2.1.1. Sewage shall be removed by a septic tank pumper, the tank cleaned, and removed to an approved disposal site. 2.1.2. It is the Contractor’s responsibility to identify an approved disposal site. 3. Installation of Tank Level Alarm System 3.1. The Contractor shall supply labor, equipment, materials and supplies to perform the required work required to install the tank level alarm system.