Specifications include, but are not limited to: Burlington International Airport is seeking proposals from contractors to supply and install Pavement Markings on the Airport’s Taxiways at 1200 Airport Drive, South Burlington, Vermont. All work will have to comply with the attached Airport Signs and Pavement Markings - Overall Signing & Marking Plan, Advisory Circulars 150/5370-10H current edition Standard Specifications for Construction of Airports and 150/5340-1M and/or current edition Airport Markings. This will include proper eradication of between 60 and 80 percent of existing markings. Provide all labor and materials to complete the following work on the follwing: - Edge Markings from hold position markings leading onto15-33 on A (x2), G, H, B, C, and J. - Runway Holding Position Markings at 15-33 on G, M, H, A, B, C and J. - Runway hold Position Markings for Rwy 1/19 at Twy A, B, C. - Twy Edge Line for the North Edge of Twy C from 1/19 to Twy G. - Twy Edge lines from Twy E onto Rwy 1/19 and from E and the 15/33 intersection. - Roadway checkered (zipper) lines on the edge of the roadway extending from the FedEx Ramp to the Pratt and Whitney Ramp (approx. 900 ft). - Twy Edge Line from the Twy C/G intersecton the Valley West Ramp (Approx 900 ft). - Twy Edge Lines on Twy C from 15/33 Hold Position Marking to Twy C/G intersection. - Twy Edge Lines on Twy J from 15/33 Hold Position Marking to Twy G intersection. - All Land and Hold Short Lines, 3 in total.