All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: • WTP2 Redundant Power improvements including installation of a new secondary utility feed to the plant and relocation of the existing WTP2 standby engine-generator. • WTP2 Power Distribution improvements including installation of a complete medium voltage loop around WTP2 with step down transformers. • Horizontal Collector Well Redundant Power improvements including installation of standby generators to Horizontal Collector Wells 3 and 4, new automatic transfer switches (ATS) and an elevated concrete structure provided at each well. • SCADA Improvements that include replacing all SLC5/05 PLCs and installation of a fiber network loop. • WTP2 Chemical Feed Improvements including completion of the plant chemical ductbank loop, replacing and relocating the fluoride feed system, membrane building chemical storage improvements, and ammonia system storage improvements. • Sanitary Sewer Improvements including rerouting the sewer mound system such that it will be able to pump offsite. The pumps at the existing sanitary lift station will also be replaced.