Specifications include, but are not limited to: Town of Barrington seeks quote for 2023 paving projects; services to include reclaiming and milling and installation of base/wearing course pavements and overlay pavement with an approximate total of 6,230 tons of pavement. Regrading and compaction shall be done using water, and any large cobbles or asphalt chunks will be removed as needed. All reclaim work shall be fine graded to a 2.5% and 3% crown. In some instances, as determined by the Road Agent, the road shall be superelevated on corners where higher speeds are prevalent. Any reclaim material not used to establish final sub-base grade can be windrowed to the shoulder where the Highway Department will use it as shoulder gravel after paving.