Specifications include, but are not limited to: Provide approximately one (1) foot of sediment removal at two ponds on the Phillips Park Golf Course with a combined area of just over 3 acres. Requested services will be provided on an hourly basis, with the deepest areas of the ponds to be addressed first. If there is sufficient time available within the designated budget, removals should then extend to the original bottom throughout the remaining shallower area in each pond. Bidders should also provide a cost to provide to provide onsite, IEPA accepted silt storage containers at the approximate dimensions shown on the location maps and described in the Schedule of Prices. It is anticipated that the City will self-perform the necessary preparation and grading of the area where the silt containers will be stored. Relocation, haul off, or any other utilization of the (eventually) dried materials will also be the responsibility of the City and is not part of this contract. The allowed hours of work are between 7:00 AM and 7:00 PM, Monday through Friday, and between 8:00 AM and 5:00 PM on Saturdays. No work shall be done on Sundays or Holidays.