All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: This project includes phase 2 and 3 of Clay Street which includes the two easternmost segments of the entire three phase plan for Clay Street reconstruction from IL 162 to North Dewey Street. Phase 1, West Clay Street (Section 15-00031-00-PV) from IL 162 to North Main Street has been constructed. Phase 2: East Clay Street (Section 17-00031- 01-PV) from Staunton Rd/N Hickory St to N Dewey Street and Phase 3: Clay Street (Section 18-00031-02-PV) from N Main Street to Staunton Rd/N Hickory Street. Total length of project is 1760.45 ft (0.33 mi). The proposed project will include full reconstruction of Clay Street with new asphalt pavement on a stabilized base and new concrete curb and gutter on both sides of the roadway from N. Main Street to N. Dewey Street. ADA compliant curb ramps along the north side of Clay Street will be built to accommodate an 8’ wide sidewalk along the north side of roadway and various segments of sidewalk will be replaced along the south side of the road.