Specifications include, but are not limited to: Provide Labor and Materials to: Asphalt parking lot including all entrance driveways and asphalt surrounding the entrances of the building – To be measured by contractor Approximate square footage 27,500 Perform milling of a maximum of 4” thick surface course and replacing it with 2.5" binder asphalt and 1.5" surface asphalt. Contractor to remove existing asphalt and haul away. Add CA-6 stone as needed to provide proper pitch and drainage. Match existing parking lot layout with striping. Contractor to ensure that slopes exist to maintain proper drainage pattern. Move parking stops as needed to perform work and put them back in place when work is completed. Dumpster/Area 1) Concrete Excavate and remove debris at proper depth for new stone and concrete Pour new 8” thick heavy-duty concrete in area according to drawing and specifications provided. See concrete drawing below. Frame and pour Approx. 600 SQ.FT.