Specifications include, but are not limited to: This Subsection is amended by the addition of the following: The Contractor is advised that this project occurs within a secured/restricted facility as determined by Homeland Security and contains security equipment for the Terminal and City of Portland that must remain functional at all times. The manner by which the project requirements shall be addressed by the Contractor are presented in each special provision contained herein, but other approaches may be suggested by the Contractor, subject to review and approval by the Owner. A summary of the project requirements is summarized below: Concrete Loading Slab Area ▪ The concrete loading slab is a locked area with perimeter fencing. During removal and installation of fence and gates, the Contractor shall ensure that the area remains secure after work hours.