Specifications include, but are not limited to: City of Rutland is requesting bids for Rutland Creek Path Segment 3 STP BP 14(24) & TAP TA 17(13) & TAP TA 21(3). LOCATION: Beginning at a point approximately at the western end of the driveway of Monsignor Connor Park, at 59 Meadow Street and proceeding northerly along the east side of East Creek, across East Creek on a new 145-foot-long pedestrian bridge, through an easement on Green Mountain Power’s parcel to West Street and then east through the City-owned parcel at 295 West Street, to the intersection of West Street and Segment 2 in Rutland City. TYPE OF CONSTRUCTION: Work to be performed under this project includes grading, subbase, bituminous concrete paving, pavement markings, precast concrete block retaining wall, a new pedestrian bridge spanning East Creek, signage and erosion controls.