Specifications include, but are not limited to: the creation of a new long-range campus facilities master plan. Central Maine Community College’s 135-acre lakeside campus has six academic buildings with an enrollment of over 3,000 students. Additionally, there are 250 students residing in four on-campus resident halls. The firm may be required to coordinate this work or additional work with other consultants contracted by the Owner. The College's last long-range, comprehensive campus facilities master plan was created in 1991. The life span of that plan intended to cover the following 20 year period and was updated in 2005 and again in 2015. The relevant content and goals in that plan have been completed. Additionally, the College’s new three-year strategic plan identifies the need for an updated campus facilities master plan.