Specifications include, but are not limited to: The work shall consist of, but is not limited to, providing all labor, materials, tools, appliances and facilities as required, to perform, in a workmanlike manner, all work and services to replace an existing 3-span, 2-lane bridge (concrete deck and timber piles) with a 3-span, 2-lane precast or cast-in-place (contractor's option), reinforced concrete bridge. Please note that if a cast-in-place bridge is selected, stamped plans shall be provided by the contractor prior to the beginning of construction. Related work will include excavation, erosion protection, storm drainage, articulated block mat (revetment) lining under, upstream, and downstream of the bridge, pilings, paving, bridge railings, tree and root removal, and other miscellaneous and associated work.