Specifications include, but are not limited to: The City of Billings, Burns & McDonnell (Engineer), and Garney (General Contractor/ Construction Manager), invite Bidders to bid on the Construction of the West End Water Treatment Plant (WEWTP) Overall Guaranteed Maximum Price (GMP) Bid Packages. The City has contracted with Garney as the GC/CM. The completed Work will provide the City of Billings with a new West End Water Treatment Plant located south of Hesper Road between Shiloh Road and South 48th Street West. supply and/or installation of Third Party Testing Services, Micropiles, Earthwork, Dewatering, Yard Piping, Process Mechanical, Electrical Subcontractor, Concrete Reinforcement, Cast-in-Place Concrete, Precast Structural Concrete, Structural Steel, Misc Metals, Interior Architectural Woodwork, Fiberglass Reinforced Gratings, Bituminous Damproofing, Penetration Firestopping, Joint Sealants, Hollow Metal Doors and Frames, Overhead Coiling Doors, Floor Access Doors and Frames, Aluminum Windows, Gypsum Board, Ceramic Tiling, Acoustical Tile Ceilings, Protective Coatings, Metal Toilet Compartments, Prefabricated Metal Buildings, Automatic Sprinkler Systems, Plumbing, HVAC, Asphalt Paving, Concrete Paving, Chain Link Fence and Gates, Landscaping, Pipe and Valve Supply, Cranes and Hoists