Specifications include, but are not limited to: Retrofitting the existing playground for ADA accessibility of the current playground located at 500 South Columbia Drive, Decatur, Georgia 30030. 1. The awarded bidder shall depict the determined on-site locations for the wayfinding signs on an overall campus plan as part of the shop drawing submittals review process. 2. Final locations for wayfinding signs shall be established on-site by the awarded bidder and the Designated Project Manager as per the final location plan document. 3. Prior to installation, the final locations and orientations for the wayfinding signs shall be reviewed by the Designated Project Manager as part of the Shop Drawing review process and shall be verified by the awarded bidder. 4. The contractor shall be responsible for staking out all new sign locations on site prior to installation. Contractor shall obtain all the necessary reviews and approvals for the wayfinding sign locations. Wayfinding signs installed in locations that have not received all necessary reviews and approvals, and that have not been established with, reviewed with, and accepted by Designated Manager may need to be removed and reinstalled in new locations. Work for relocating such wayfinding signs shall be completed by the awarded bidder at the bidder’s own expense.