Specifications include, but are not limited to: Project scope includes renovation of Mechanical Room C-1043 and relocation of the fire protection equipment from C-1031 into C-1036. Mechanical, Plumbing and Electrical upgrades to adjacent areas of the C Concourse are also part of this project and will require ceiling work in those areas. Mechanical scope includes HVAC piping and ductwork, steam, fire protection, plumbing, and building automation. Demolition scope includes the removal of pumps, steam piping and equipment, ductwork, Air Handling Unit, domestic water piping, sanitary and recirculating pump, and pneumatic controls. New installation includes new VAVs, pumps, Air Handling Unit, mechanical piping, finned-tube radiation, steam heat exchangers, unit heaters, ductwork, fans, and all associated controls. New plumbing work includes underground sanitary, domestic water piping, recirculating pumps, balancing valve, floor sinks, floor drains, and plumbing fixtures. Electrical work includes power, lighting and telecommunications systems. This project requires work to provide temporary power and data to remote trailers for the temporary relocation of tenants during the phased construction. Temporary trailers will be located adjacent to Gate C3 and east of Gate G22.