All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: This project is for the demolition and replacement of the existing gym floor at Grayson High School. The size of the floor is approximately 17,500 square feet and work will consist of: • Disconnect, work around, and reconnect bleachers to the wall. • Remove the entire wood floor and sub-floor system, down to the concrete substrate. • Install new system per specifications • Sand the entire floor with (3) three cuts: coarse, medium, and fine. • Measure, tape, water pop, and stain the floor as per the approved drawing and attached graphics (Attachment A). o Apply 2 coats of water-based gym floor sealer • Measure, tape, and paint all game lines and lettering, as per the approved drawing. o Appy 3 coasts of water-based gym floor finish • Install new 3” x 4” vented cove base, 6” aluminum thresholds, and volleyball cover plates.