Specifications include, but are not limited to: Furnish, assemble, provide start-up/testing and commissioning of an on-site sodium hypochlorite generation (OSG) system of the type specified herein, in place complete, as shown on the drawings at the Olinda Site. B. Remove existing OSG system from the Kamole WTP. Transfer and deliver to the Olinda WTP, assemble/incorporate into the existing OSG system and provide start-up testing and system commissioning. C. lnstall new OSG system at Kamole WTP D. The scope will be bid as complete systems at both the Olinda and Kamole WTPs. E. All components associated with the OSG unit, as specified herein, shall also be furnished and installed by the OSG unit manufacturer or its regional representative. The OSG unit manufacturer or regional representative shall also furnish the sodium hypochlorite storage tank ievel transmitter as specified in the PART 2 - PRODUCTS.