Specifications include, but are not limited to: Construct the Cleveland Hwy Sewer Extension to Strain Road Project as shown in the drawings and specifications. The project will include Horizontal Directional Boring of approximately 14,000 LF of sanitary sewer force main and include installation of fittings and air release valves as well as Jack and Bore Steel Casing; Dalton Utilities will supply the HDPE pipe, fittings and steel casing for the project. The contractor will be responsible for supplying all other materials. The Contractor’s work also includes all erosion, sedimentation, and pollution control necessary for the project. The cost of any permits required for erosion control and land disturbing will be borne by the Owner. The Contractor will be responsible for the cost of any other permits or licenses required to complete the work. The Contractor will complete all necessary clean-up and restoration work to include filling, finish grading, grassing, landscaping, pavement repairs, driveway repairs, culvert repairs, drainage ditch restoration and other necessary restoration activities such that post construction conditions are EQUAL TO OR BETTER than those conditions that existed prior to any construction activity occurring.