Specifications include, but are not limited to: This project consists of, but is not limited to, the removal of; approximately 735 feet of 12 inch asbestos cement water main, drainage structure, manholes, fire hydrants, bituminous surface, sidewalk, and curb & gutter for the purpose of replacing the water main. Removal and disposal of asbestos cement water main will be accomplished in accord with all state and federal asbestos regulations. This project will also require the installation of 735 feet 12 inch C-900 water main, re-connection of three water services, three fire services, installation of two fire hydrants, and the installation of a drainage structure. The installation of new water main includes, but is not limited to, paving of all removed asphalt roadway, replacing sidewalk and curb & gutter.