Specifications include, but are not limited to: The project is located at track next to Sanford Gym on the East Campus of Albany State University. The purpose of the project is to to update our current track. Running Track and Field Events Yielding 53,100 sf: 1. Remove and dispose of the existing track surface. 2. Remove silt and debris from existing track slot drain. 3. Mill the existing asphalt at the track oval a depth not to exceed 1.5”. 4. Apply asphalt tack coat and repave the track oval utilizing 1.5” of asphalt topping virgin blend 5. Furnish and install a 13mm, polyurethane, track surface utilizing the BSS-300 system by BEYNON Sports 6. Furnish and install track markings per NCAA standards 7. Clean jobsite and install seed / straw in areas disturbed by construction operations. Steeplechase Event; Complete site excavation as required for pit & running lane installation & export spoils 2. Furnish and install utilities required for pit operation 3. Furnish and install a prefabricated water jump pit form system by UCS and backfill with 3500-psi concrete 4. Furnish and install 2” of wash stone, vapor barrier and 4” of concrete at the pit running lane. New concrete must cure 28 days prior to surface application. 5. Furnish and install pit covers & jump barrier 6. Furnish and install the BSS-300 system @ the running lane and pit covers