Specifications include, but are not limited to: Contractor will provide all labor, equipment, materials, incidentals, and traffic control to remove and replace concrete curb and gutter, curb inlet frames and grates prior to commencing work on the Mill and Fill and Overlay portion of the project. Construct new ADA compliant sidewalk, curb and gutter and inlet structures according to the MDT provided plans and MDT Standard Specifications. Contractor will provide all labor, equipment, materials, incidentals, and traffic control to cold mill approximately 180,400 square yards of roadway at a depth of .15” as directed by MDT’s project manager. The Contractor is responsible for hauling and disposal of the generated cold millings. Contractor is responsible for adjusting 5 manhole structures as directed by the MDT project manager following cold milling operations and prior to the Overlay portion of the contract. Contractor will provide all labor, equipment, materials, incidentals, and traffic control necessary to produce, haul, place, tack and compact approximately 17,900 tons of 1/2” Commercial Plant Mix Grade S PG 64-28 asphalt mix material. The overlay shall be paved .15 feet thick and approximately 41 feet wide. Contractor is responsible for identifying centerline prior to paving and must use an identifiable method to maintain consistent centerline control (i.e., Stringline or Paint) with approval from MDT’s project manager when paving. Before commencing with the Chip Seal, the Contractor shall provide all labor, equipment, materials, incidentals, and traffic control necessary to install approximately 19 (nineteen) miles of Sinusoidal rumble strips on the centerline and shoulder of the roadway following completion of the Overlay as directed by the MDT project manager.