Specifications include, but are not limited to: Home St., 11th St. and 12th St. - Install new service to existing meter location or as approved by City of Hastings. Install existing meter with 2 new ball valves on each side of meter or at a location agreed upon by City of Hastings and property owner. Contractor will shut off existing stop box and remove min 12” of stop box and fill with dirt or concrete. If service stop box cannot be found contractor will dig up at main and shut off corporation cock. A. Supply and install saddle, corporation stop, stop box and 1” PE service from the new 8” DIP main on South side of Home St. to the houses on both North and South sides of the street. 19 services B. Supply and install saddle, corporation, stop box and 1” PE service from the existing 10” DIP main on South side of 11th St. to the houses on the North side of the street. 11 services C. Supply and install saddle, corporation, stop box and 1” PE service from the existing 10” DIP main on South side of 12th St. to Real-estate Group of Hastings and Hastings Vision clinic on the South side of the street. 2 services.