Specifications include, but are not limited to: The scope of work for this project will include removal of existing air handling units and DX system equipment located on the roof of the SC Building. The demolition scope will also include the removal of an existing air handling unit located within the building. The new HVAC system will require the install of a new air-cooled chiller and new chilled water roof top units. The new chiller will require a new support platform along with structural modifications to the building. New curbs and associated structural modifications will be required for the new rooftop units as well. The scope above will also include service piping, electrical services, and modifications and repairs to the existing roof.