Specifications include, but are not limited to: Provide PCT Line Cleaning Fuel to the Municipality of Anchorage (MOA), Port of Alaska (POA). The Scope of Work for this project covers all work required to commission five petroleum product lines at the POA PCT. This includes the installation, and later removal, by the Contractor of start-up strainers in the POAVY to protect downstream equipment on five petroleum product lines during commissioning. With the strainers in place, the lines will be commissioned by the Contractor using fuel offloaded from a vessel berthed at the PCT, through POAVY, and into tankage at a terminal facility connected to the POAVY. The Contractor will perform one soak test on each line according to the American Petroleum Institute Recommended Practice (API RP) 1595. Contractor shall conduct fuel testing and tank gauging of fuel delivery vessel and terminal tank before and after flushing of each line. Once the product line passes the soak test, it will be considered successfully commissioned and ready for normal operation. If it does not pass the soak test, the sweep and soak procedure shall be repeated. After the five product lines have passed the soak test, the Contractor shall remove the strainers. It is anticipated that the product lines will be commissioned independently due to the various constraints including vessel schedules and availability of specific products.