Specifications include, but are not limited to: Newton County Board of Commissioners is requesting separate Sealed Proposals for Construction of a Horse Pole Barn for the FFA Camp. All construction work shall be performed in accordance with established construction safety standards that requirements of the Occupational Safety and Health Administration. The Contractor shall be generally responsible for the safety of the employees and the public in the work area for the duration of the project. Minimum Requirements: Mian Building Size: 36’X264’; Lean-To’s (2) 24’X264’; Inside Height 16 ‘; Main Roof Pitch 4/12; Lean-To-Pitch 2/12; Overhands 24”; 1. Building to be wood frame with 6x6 pressure treated wood post placed 12 Ft. on center. Post are to be totally encapsulated by concrete as floor is poured so as to fill pier monolithically with slab and avoid horizontal construction joint in accordance with item 16 under concrete, page C1.0. Do not fill remainder of pier with compacted fill as indicated on sheet S1.1. 2. Floor is to be 4 in fiber infused concrete—4,000 lb psi-sawcut per drawings –ref S1.2 for drawing and spec, geo test required. 3. Roof trusses are to be 12 ‘on center with sp 2 -2x6 perlins-24 in on center. Must use tube steel. 4. Roof panels and side panels are to be Jackson rib 29 ga panel attached with screws. Color of roof and side panels are to match existing buildings. Building will have 4 cupolas installed at ridge -10’x 2’ with manual dampers. 5. Gutters to be 6 in K style seamless with down spouts. Down spouts are to connect to underground drain system and discharge into existing detention pond. Water to discharge on rock at end of pipe. 6. Page P1.0—Underground water line is to be schedule 40 PVC per size indicated on drawings and connect to existing water supply across road for new building—approx 200 Ft.