Specifications include, but are not limited to: a. Assistance to City staff for public relations and responses to inquiries of business owners and the general public. b. Meet with City staff at critical stages throughout design. c. Perform field and topographic surveys. d. Coordinate with other City utilities and private utility owners. e. Prepare temporary easement, permanent easement, and/or right-of-way descriptions as necessary. f. Develop a traffic control plan to carry local traffic. g. Develop and submit conceptual drawings (30% complete) with an estimate of probable construction costs (EPCC). h. Develop and submit field-check drawings (60% complete) and an updated EPCC. i. Facilitate two (2) public meetings: the first to be held after field-check drawings are complete to introduce residents to the project and gather input; the second to be held after the bid letting, but prior to construction. j. Develop and submit office-check drawings and project manual (90% complete) and an updated EPCC.