Specifications include, but are not limited to: Scope of Work includes but is not limited to the following: This Project will consist of the installation of the new non-potable water steel storage tank at the Bayo Booster Station near the Los Alamos Composting Facility. This non-potable water tank will provide additional storage of up-to 833,000 gallons. In addition, modifications to the existing 190,000-gallon non-potable concrete water storage tank will be to install a new FRP (“Fiber Reinforced Polymer”) cover to enclose the tank to eliminate the algae growth and prevent weeds and debris entering the tank when windy. The overall goal is to have the existing concrete tank and the future steel tank for effluent water storage from the Los Alamos wastewater treatment plant. The non-potable water from these tanks will be used for irrigation of Los Alamos Golf Course, Los Alamos Middle School, North Mesa Ball Fields, and North Mesa Soccer Fields.