Specifications include, but are not limited to: 1. FILL, PATCH, SAND, AND FINISH EXISTING SURFACES TO REMAIN. RESTORE TO "LIKE NEW" CONDITION. REFER TO FINISH PLAN AND SCHEDULE. 2. WHERE DEMOLITION OF EXISTING SURFACE WALL TREATMENTS, SUCH AS WALLCOVERING OR PANELING, HAS DAMAGED THE UNDERLYING WALL FINISH TO REMAIN, SKIM COAT WALLS AS REQUIRED TO PROVIDE A SMOOTH SURFACE SUITABLE FOR PAINTING OR APPLICATION OF OTHER NEW FINISH. REFER TO FINISH PLAN. 3. WHERE NEW WALL MOUNTED FURNISHINGS ARE SHOWN, SUCH AS CABINETS, COUNTERS, SHELVING, PANELING, CHAIR RAILS, GRAB BARS, RAILINGS, GUARDS, BUMPERS, STOPS, ETC: PROVIDE AND INSTALL FIRE RATED BLOCKING IN THE WALL BEYOND. WHERE THE WALL BEYOND IS EXISTING, PATCH AND REPAIR EXISTING WALL BOARD AND FINISH AFTER INSTALLATION OF BLOCKING. 4. WHERE EXISTING CEILING AND WALL SURFACES ARE SCHEDULED FOR NEW FINISHES, CONTRACTOR SHALL CAREFULLY REMOVE EXISTING WALL-MOUNTED EQUIPMENT FOR FINISH APPLICATION AND SAVE, STORE AND PROTECT SAID EQUIPMENT FOR REINSTALLATION AFTER COMPLETION OF WORK BY OTHERS. COORDINATE WITH OWNER. 5. WHERE ENGINEERING WORK IS TAKING PLACE IN ADJACENT AREAS, ALL MATERIALS DAMAGED DURING DEMOLITION AND CONSTRUCTION SHALL BE REPAIRED TO MATCH. SURFACE(S) SHALL BE PREPARED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS WALLS SHALL BE REPAINTED IN THIER ENTIRETY. 6. ALL PENETRATIONS IN RATED PARTITIONS (NEW AND EXISTING) SHALL BE PATCHED IN WITH UL APPROVED AND / OR ACOUSTIC ASSEMBLY TO MATCH PARTITION RATING.