Specifications include, but are not limited to: 1. Pamphlet Handout. The contractor shall be responsible for delivering the “Joint and Crack Seal” pamphlet to all properties on the location list (Attachment A). This pamphlet needs to be delivered a minimum of one week prior to the start of work at a location. The City of Wichita will provide the pamphlets and door hangers to the contractor for distribution. This pamphlet does not replace the contractors 48 hour notice to property owners. All work associated with the distribution of these notifications shall be considered subsidiary to other bid items. 2. Sweeping. In areas with a large amount of debris, the contractor will be required to sweep the street if directed by the project Engineer or Inspector. This must be accomplished by use of a vacuum or regenerative air type sweeper. The contractor will be responsible for proper disposal of all material collected during the sweeping process. Cost for this work will be paid for with the bid item “Sweeping”. All other specifications for removing loose material from the curb and gutter or driveways still applies and that work is considered subsidiary to other bid items. Any debris dislodged from the cleaning operation over 1 inch in diameter must be picked up and disposed of by the contractor. Work for this is considered subsidiary to other bid items.