Specifications include, but are not limited to: Complete removal of existing 3” asphalt paving at selected locations for replacement with concrete. B. Prep, form and install concrete aprons at each of the following Overhead Doors 27, 28, 32, 33, 36, 40, 43, 45, 46, 52, 53, 54 at 4850 Garage Building. Approximate dimensions for each door are listed below: - Door 27 is 19’4” W x 10’ D - Door 28 is 19’0” W x 10’ D - Door 32 is 24’0” W x 10’ D - Door 33 is 24’9” W x 10’ D - Door 36 is 26’6” W x 10’ D - Door 40 is 14’0” W x 10’ D - Door 43 is 28’6” W x 10’ D - Door 45 is 28’6” W x 10’ D - Door 46 is 25’2” W x 10’ D - Door 52 is 22’8” W x 10’ D - Door 53 is 18’8” W x 10’ D - Door 54 is 18’8” W x 10’ D C. Concrete aprons shall be done in phases as indicated on the plan to minimize disruption for the garage. The first phase aprons shall be completed and appropriately cured to allow for vehicle traffic prior to starting the next phase of aprons.