Specifications include, but are not limited to: Preliminary and final design for interim safety improvements at the Exit 6 SB on ramps for I-293 and associated work on Eddy Road in Manchester. This project will utilize, as a starting point, the existing design work and plans that have been advanced to the Public Hearing Plan Phase for the Manchester 16099 project (Exit 6 and 7 project). This effort will also require services to support project advertisement including, but not limited to: Roadway preliminary and final design; Environmental efforts including all environmental permitting, and hazardous materials investigations; Drainage design including hydraulics, pollutant loading and construction stormwater assessments; All survey; All geotechnical investigations and reports (including pavement recommendations); All utility coordination (including coordination of relocations); Construction traffic control & constructability evaluations; Public outreach including newsletters and website maintenance for the entire Manchester Exit 6 and 7 corridor