Specifications include, but are not limited to: The Town of Duxbury has entered an agreement with the Vermont Agency of Transportation (VTRANs) to develop a project. The contractor will be responsible to develop plans with PE approval and verify and obtain any required permits. Upon completion, the town will receive a copy of any documents relevant to the design, permitting and construction of this project. The following repairs need to be made based on the VTrans bridge inspection report and recommendations made by VTrans District 6 Office: Repair concrete in scaled/abraded areas in abutments and wingwalls. Place large stone fill in scour holes, generally on the north bank of the river at and around the abutment. Repair the concrete bridge deck overhang on the downstream side. Replace bridge rail post anchor bolts, replace or reset 3 or 4 approach posts. Replace approach rail with terminal section of G1-D still taper/flare in accordance with VTrans standards. All aspects of project development, from developing a purpose and need statement to constructing the project, must conform to federal and state regulations.