Specifications include, but are not limited to: 12,500 SY Remove Pavement, 1,700 SY Remove Asphalt Pavement, 9,000 SY Remove Bikepath, 46,800 CY Common Excavation, 12,500 CY Granular Material for Base, 21,500 SY Doweled 8” Concrete Pavement, 2,100 SY Reinforced Concrete Doweled, 390 SY 4” Concrete Median Pavement, 33,000 SF Bikepath, 3,000 SF Sidewalk, 800 LF Various Sizes RCP Class III, 5,100 LF 4” Perforated Underdrain with sock, 25 LF Standard Area Drain, 1 LS 8’x8’ Box Culvert, Modifications to existing Sanitary Sewer and Storm Sewer Manholes, 1 LS Traffic Signal System, 1 LS Pedestrian Crossing Beacon System, 20 EA Furnish and Install Commercial Street Lights, 3,850 LF 1,300 LF 1.5” Conduit - #8 THWN, 1.5” Conduit - #6 THWN, 950 LF Conduit - #4 THWN, 2,500 LF Fiber Optic Cable, various signing and striping, and other miscellaneous work items.