Specifications include, but are not limited to: 5.1 Contractor shall furnish all labor. 5.2 Equipment and supplies used by the contractor shall be subject to approval by the City. 5.3 The following is a list of supplies to be furnished by the City, but to be responsibly administered by the contractor: soaps, waxes, disinfectant, cleaning buckets, miscellaneous cleaning equipment, mops, chemicals, cleaning applicators and rags, paper towels, urinal screens and deodorizers, wastebasket liners, hand soap, toilet tissue and spray disinfectant. 5.4 The City will provide contractor with adequate area to store their equipment and supplies and such area shall be maintained in a neat and orderly manner by the Contractor. 5.5 Contractor shall properly dispose of all used chemicals, containers and supplies in strict accordance with all OSHA and EPA standards and all local requirements. 5.6 Contractor shall advise City Agent of low inventory items for City-provided supplies. 5.7 Rooms are to be secured upon completion of work as before they were entered. 5.8 Cleaning shall be performed Monday, Wednesday and Friday between 7:00 a.m. and 4:00 p.m. except for official holidays observed by the City or areas where schedule is noted. 5.8.1 Work outside the normal office hours may be scheduled after the contractor becomes familiar with facility procedures and areas that services will take place. 5.9 Janitorial services as specified shall be performed in the following areas and rooms: Every visit unless noted otherwise. 5.9.1 Restrooms (420 sq. ft.) 5.9.1.1 Clean toilets, sinks and mirrors 5.9.1.2 Disinfect all surfaces 5.9.1.3 Empty trash 5.9.1.4 Replenish supplies 5.9.1.5 Sweep and mop floors 5.9.1.6 Clean and disinfect drinking fountain 5.9.2 Main Entrance and Hallway from Maintenance to Employee Entrance (2100 sq. ft.) 5.9.2.1 Sweep and mop floors 5.9.2.2 Vacuum rugs 5.9.3 Kitchen and Lunchroom (900 sq. ft.) 5.9.3.1 Clean sinks and appliances 5.9.3.2 Disinfect all surfaces 5.9.3.3 Sweep and mop floors 5.9.3.4 Empty trash cans 5.9.4 Locker Rooms (1240 sq. ft.) 5.9.4.1 Clean toilets, sinks and mirrors 5.9.4.2 Disinfect all surfaces 5.9.4.3 Empty trash 5.9.4.4 Replenish supplies 5.9.4.5 Sweep and mop floors 5.9.5 Operation’s Restroom (35 sq. ft.) 5.9.5.1 Clean toilet, sinks and mirrors 5.9.5.2 Disinfect all surfaces 5.9.5.3 Empty trash 5.9.5.4 Replenish supplies 5.9.5.5 Sweep and mop floor 5.9.6 Operation Control Room (520 sq. ft.) 5.9.6.1 Vacuum rug 5.9.6.2 Empty trash 5.9.7 Administration Area (1200 sq. ft.) 5.9.7.1 Vacuum rugs (once/week) 5.9.7.2 Empty trash 5.9.8 Training Room and Conference Room (1000 sq. ft.) 5.9.8.1 Vacuum rug 5.9.8.2 Clean tables 5.9.8.3 Disinfect all surfaces 5.9.8.4 Empty trash 5.9.9 Water Lab (2100 sq. ft.) 5.9.9.1 Empty Trash 5.9.9.2 Dust Mop Hard Surface Floor (once/week) 5.9.9.3 Wet Mop Hard Surface Floor (once/week) 5.9.10 Water Lab Office Space (650 sq. ft.) 5.9.10.1 Vacuum Carpet 5.9.10.2 Empty Trash 5.9.11 Small Outlying Restrooms 5.9.11.1 Ozone Building bathroom (50 sq. ft.) 5.9.11.2 South Pump Station bathroom (30 sq. ft.) 5.9.11.3 North Pump Station bathroom (men & women, total of 80 sq. ft.) 5.9.11.4 East Treatment Plant basement (30 sq. ft.) 5.9.11.5 East Treatment Plant Maintenance Shop (30 sq. ft.) 5.9.12 Duties Required 5.9.12.1 Clean Toilets and mirrors 5.9.12.2 Empty Trash 5.9.12.3 Replenish Supplies 5.9.12.4 Sweep and mop floors 5.9.12.5 Clean and disinfect all surfaces