Specifications include, but are not limited to: o Pictures must be provided, through each step, to housing inspector during repair. Pictures must be clear, and referenced to home being worked on. Pictures are to be provided in real time, prior to home being completed. o Areas that are found to be spaced decked shall be covered with ½” exterior grade sheathing material after removing the existing decking. It is the contractors responsibility to ensure the framing and structure will support the additional load. o Remove existing roofing materials down to bare decking. o Check all roof trusses/rafters and repair/replace as needed to ensure that new roof structure is flat and smooth without rises or depressions in roof system. o Replace all rotten, broken, un-even, weak, or deteriorated decking framing. o Any exposed repaired or replace wood should be protected from the elements, painted to match existing color or white. o Replaced/repaired decking shall be level and ready to accept felt and shingles. o Check all roof trusses for strength and stability before re-shingling house. o Remove all unused elements, vents, etc., that are not operational and close them below roof level. o Re-flash all valleys, vents, roof openings, and chimneys.