Specifications include, but are not limited to: Construction of approximately 10,900 Tons of (1/2”) Hot Mix Asphalt with 20% RAP (RAP Provided by OWNER from 2023 millings/hauled by CONTRACTOR), 550 Tons of (3/8”) Hot Mix Asphalt, 35 Tons of Tack Oil, 550 Tons of 58-34 Binder with Evotherm, 47,500 Square Yards of Cold Asphalt Milling, 35 EA Adjust Manholes w/ Owner Furnished Rings, and 70 EA Adjust Valves w/Owner Furnished Materials. City Patch Mix and Paver-Laid Patch Mix. All to be completed on City streets, roads, and parking lots. 1. Tack, SS-1h or CSS-1h (min .05 gal/SY) 35 TON; 2. Performance Grade 58-34 Asphalt Binder (Including EVOTHERM @ 0.50% by wt.) 550 TON; 3. Cold Milling Asphalt 0-3” Full Width OR Edge Mill 47,500 SQYD ; 4. Additional Depth Cold Milling (>3”) 100 SQYD; 5. 20% RAP Asphalt Concrete Class E (modified) (20% RAP Provided by Owner) “Standard” Lift (1/2”) – Type I 10,900 TON; 6. Asphalt Concrete Class E (modified) “Thin” Lift (3/8”) – Type II 550 TON ; 7. Adjusting Manholes w/ Owner Furnished Rings 35 EA; 8. Paving Incentive* 14 BLOCK