Specifications include, but are not limited to: • Complete demolition and removal of existing storm drain pipe systems and headwalls, street saw cut, curb and gutter, tree removal, removal of fencing, etc. • Installation of erosion control BMP’s. • Construction stalking. • Protect light pole(s) and utility box(es). Relocate them if necessary. • Install new 18” HDPE (double wall & smooth interior) and RCP pipes and tie-in to existing storm drain structures including stone bedding, backfill up to spring elevation. • Asphalt Patch and curb & gutter replacement. • Installation of new pre-cast headwalls with rip-rap. • Installation of new Precast drop inlet. • Ditch clean-out and installation of new Rip Rap channel/ditch under geotextile fabric. • Install complete new fencing, cleanup and re-grout structures. • Installation of sod on areas disturbed by construction activities. • The equipment and materials to be furnished by the Contractor will be installed at the locations shown on the drawings and as described in the respective section of these specifications. • All work shall comply with all Federal, State, and local requirements and specifications.