Specifications include, but are not limited to: 1.CLEANING UPThe Contractor shall keep the premises and surrounding area free from accumulation ofwaste materials or rubbish caused by operations under the Contract. At completion of theWork, the Contractor shall remove from and about the project waste materials, rubbish,the Contractor’s tools, construction equipment, machinery and surplus materials.2.SAFETY OF PROPERTYThe Contractor shall take precautions and be responsible for any damage caused duringconstruction for other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction.3.CONTRACTOR’S STORAGE OF MATERIALS The Contractor shall be entirely responsible for all storage materials. A reasonable storage area will be provided on the job site