Specifications include, but are not limited to: This project consists of removing and replacing the damaged bridge handrail on City Bridge No. K10A located on SE 29th Street over Butcher Creek and on City Bridge No. E15A located on SE Rice Road over the Shunganunga Creek. Drilling Holes. Provide the Engineer with a copy of the grout (cementitious or Type IV epoxy-resin bonding system for concrete) manufacturer’s instructions. Drill the holes into the existing concrete to the diameter recommended by the grout manufacturer. When drilling for new reinforcing steel, use a pacometer to avoid drilling into the existing reinforcing steel. In the absence of recommendations from the grout manufacturer, drill the holes approximately ¼ ± 1/16 inch larger than the diameter of the anchor bolts, dowel bars, tie bars and reinforcing steel without damaging adjacent concrete. Maintain proper vertical and horizontal alignment while drilling the holes. . Removal of Existing Structures . Mobilization . Traffic Control . Fence (Chain Link)(5')(Special) L.F. 64 . Bridge Repair . Drilling & Grouting Each 8