Specifications include, but are not limited to: 1. The contractor will be required to provide comprehensive services to complete the entire process of the data/fiber optic and IMSA multiconductor Fire alarm at the sites specified. These services will include system-level design including proposed routes, infrastructure, technical specifications, build timing, associated costs, and schematic diagrams. Pole permitting will also be required on poles on Buckmeadow Rd and on Fordham Dr, Leslie Ln and portions of Gendron St 2. A specific, detailed, actionable, phased implementation plan, with timelines and costs to build the network including interim steps we can take to prepare for network expansion. 3. Governance, ownership and management guidance including zoning and Right of Way (ROW) ordinances, potential legal ramifications and roadblocks to the plan, leasing and asset sharing guidelines and templates. 4. The contractor will be expected to provide experienced staff with adequate expertise in project management and wiring technologies to comply with the implementation standards required by NSD.