Specifications include, but are not limited to: Contractor installs concrete switching cabinet pad per Entergy specifications. Final switching cabinet location must be approved by Entergy Engineering Department. See details included in this package. • Contractor installs primary conduit system minimum 48” deep. o Conduit should be installed from the transformer pad to the riser pole and one section up the riser pole. Entergy will install the remaining conduit sections up the pole with the Contractor or Electrician providing the conduit. o All conduit runs require a small gauge copper pull wire. o All 90d and 45d elbows must be 36 inch radius, rigid, galvanized steel. The elbows at the switching cabinet pad and the riser pole must be encased in concrete dyed red. o Schedule 80 Electrical Grade, Sunlight Resistant PVC conduit or galvanized rigid steel conduit must be installed at the switching cabinet pad and the riser pole. o Schedule 40 PVC conduit may be used below ground. o Conduit layout must be approved by Entergy Engineering Department prior to installation. o No more than three 90 degree turns. • Contractor must install a ¼” polypropylene pull rope in conduit.