Specifications include, but are not limited to: The City of Rio Rancho is soliciting formal bids for the installation of various size Bollards at pre-determined locations at the Rio Rancho Event Center located at 3001 Civic Center Circle, Rio Rancho, NM, 87144. The Contractor shall furnish all construction staking and surveys required to construct the project in accordance with the bearings, distances, and coordinate points specified in the drawings. The Contractor shall be responsible for furnishing the OWNER with as-built survey information/record documents for construction work performed per Chapter II.7 of the City of Rio Rancho's Development Process Manual (DPM) Revised for Public Works and the Supplementary Conditions 4.05.B. As-built survey information/record documents shall be considered incidental to the project and no separate payment shall be made thereof. Contractors must contact Waste Management in Rio Rancho if a dumpster or roll off is necessary for proper containment, removal, and disposal of construction debris for any projects completed within Rio Rancho City Limits. The Contractor shall represent the faithful final completion of the work, including but not limited to correction of incomplete or deficient items identified in the final inspection; final cleaning and removal of temporary facilities and controls; preparation and delivery of operation and maintenance manuals, record drawings, and other project records and documents; completion of all required demonstrations and training; completion of all close-out submittals; and all other close-out procedures and requirements, if any, required for the Project.