Specifications include, but are not limited to: All materials for the repair (clamps, fittings, couplings, pipe, etc.) will be made available at the Service Center Warehouse, located at 111 H.O. Mills Blvd, Port Arthur, Texas. The City is responsible for ordering and maintaining repair materials. The Contractor’s Supervisor will be responsible for communicating the material needs of each job to the Utility Operation Manager or designee before obtaining the items from the Warehouse. Items will be signed out and accounted for by Warehouse Personnel, with the approval of the Utility Operation Manager or the designee. 1. The work will be unscheduled, intermittent, and on an “as needed” basis. The contractor will be expected to have personnel and equipment available for repairs when required. 2. Contractor shall maintain an emergency “on-call” number, or answering service to answer all calls placed after normal working hours seven (7) days per week and during holidays. An emergency repair will be responded to within 2-hours. 3. Utility locates will be coordinated by the Contractor. 4. The Contractor is expected to perform all work in a competent and professional manner. Any damage to a City building or facility, either direct or indirect, resulting from the Contractor or his employees, must be repaired fully and completely at the Contractor’s cost, including work, materials, and any litigation fees that may be incurred to recover the cost of such damages not repaired in a workmanlike manner.