Specifications include, but are not limited to: A shared use concrete path will be constructed with lighting, contrasting concrete stamped buffer, curb and gutters, storm sewer inlets with closed drainage pipe structures, and cross walk facilities. The typical shared use path pavement cross section shall include a 7' wide concrete shared use path, 3' wide stamped brick buffer strip, 4.5' wide curb and gutter, and a saw cut to define a clean the existing shoulder on High Ridge Boulevard. A cross walk will cross High Ridge Boulevard at Community Lane to provide pedestrian and bicycle access from the shared use path to High Ridge Elementary School. Street lighting will provide ambient light for both High Ridge Boulevard and the shared use path using decorative multi globe light standards on poles. The total project length is 4,505 ft.