Specifications include, but are not limited to: Installation of medium voltage pad mount switches. The switches will provide preferred/alternate feeds to various campus buildings and isolation capabilities. These switches will be installed on the existing electrical distribution system at selected locations. The locations of the switches have been indicated on site electrical plans, as provided. b. Installation of an alternate feed to the Virks/ Bernadette building medium voltage pad mounted switch and the installation of a pad mount transformer at Bernadette Building to replace existing vault transformers. The location of the pad mount equipment has been indicated on site electrical plans, as provided. c. Installation of ground water seals in electric manholes to mitigate infiltration of ground water into the Central Power Plant. The locations of the two manholes have been indicated on site civil and electrical plans, as provided .