Specifications include, but are not limited to: THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY WITH ACHM SURFACE COURSE SELECT SECTIONS OF GRASS MEDIAN DIVIDED HIGHWAY 65 AND AT-GRADE MEDIAN CROSSOVERS FOR APPROXIMATELY 11.226 MILES IN CHICOT COUNTY. THIS PROJECT CONSIST OF REMOVAL AND DISPOSAL OF GUARDRAIL, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, GUARDRAIL, RUMBLE STRIPS, MAINTENANCE OF TRAFFIC ITEMS, PAVEMENT MARKINGS, AND MISC. ITEMS. 11.226 miles in length. R&D OF GUARDRAIL 1,095.00 LF; TACK COAT 84,270.00 GAL; MA IN ACHM SURFACE(1/2") 51,747.00 TON; AB(PG70-22)ACHM SURF(1/2") 2,781.00 TON; COLD MILLING ASPHALT PVMT. 495,294.00 SQYD; MOBILIZATION 1.00 L.S.; MAINTENANCE OF TRAFFIC 1.00 L.S.; SIGNS 516.00 SQFT; CONST.PAVEMENT MARKINGS 488,950.00 LF; CONST.PAVEMENT MARKINGS (WORD) 9.00 EACH