Specifications include, but are not limited to: The City of Bloomington Street Department through its Board of Public Works (hereinafter “City”) is seeking sealed bids for Bituminous Materials and Tack Oil ; Bituminous Material – Cold Mix (B.C.A) 200 tons more or less of Mixed Winter Stockpile Material Picked up by city trucks at the plant; Bituminous Material – Hot Mix (H.A.C.) 20,000 tons more or less of Hot Asphaltic Concrete Surface, #11 or #9 Picked up by city trucks at the plant; 200 tons more or less of Hot Asphaltic Concrete Intermediate, #8 or #9 Picked up by city trucks at the plant; 200 tons more or less of Hot Asphaltic Concrete Base, #5 Picked up by city trucks at the plant; Bituminous Material Millings and/or Asphalt Chips 8,000 tons more or less of Recycled Asphalt Product from street millings Delivered to the plant by city trucks; Tack Oil 2,500 gallons more or less of Tack Oil. Picked up by city trucks at the plant ;