Specifications include, but are not limited to: The project generally includes reconstruction and realignment of a portion of Taxiway C between Runway 5-23 and Taxiway C1. To the southeast between Taxiway C1 and Runway 34, the Taxiway will retain the current alignment and will receive an asphalt overlay. The project also includes: • Full depth asphalt pavement construction. • Earthwork and demolition of existing pavement, soils as necessary, electrical equipment, and drainage infrastructure. • New LED edge lighting and signage, conduit and circuitry. • Installation of Runway Guard Lights at the Runway 34 intersection with Taxiway C and the intersection of Taxiway C1 and Runway 16-34. • Installation of new Runway 16-34 RGL circuit • Replacement of the Taxiway C circuit homerun cables. • New stormwater drainage pipes, inlet structures, manholes, and stormwater control structures.